The Client identified a need to temporarily transport hot bitumen by truck from one facility to another. Rally complete a DBM and then carried the preferred design option through detailed engineering. As a multi-discipline project, all disciplines coordinated efforts to produce the deliverables.
- Civil (Construction Work Package) CWP
- Piping/Mechanical CWP
- Electrical/Instrumentation CWP
- PHA Report
- Vendor Performance Specifications
Download PDF