Project Overview

Rally completed the Design Basis Memorandum (DBM) and detailed engineering phases to support the Client's need to temporarily send hot bitumen by truck from one location to another. Rally helped identify the preferred design option, completed detailed engineering design work including facilitating the PHA/HAZOP, coordinated work with the Vendor, and supported field RFIs during construction. The design included new heat traced hot bitumen piping to the meters, foundations, power, grounding for rental meter skids, and modifications to existing roadways and gates within the client’s facility. This was a fast track project in which Rally was able to start DBM and issue IFCs with holds in three months, with another month to release holds once Vendor information was finalized.

Hot Bitumen Truck Loading main Hot Bitumen Truck Loading first

Scope of Work

The Client identified a need to temporarily transport hot bitumen by truck from one facility to another. Rally complete a DBM and then carried the preferred design option through detailed engineering. As a multi-discipline project, all disciplines coordinated efforts to produce the deliverables.

Deliverables

  • Civil (Construction Work Package) CWP
  • Piping/Mechanical CWP
  • Electrical/Instrumentation CWP
  • PHA Report
  • Vendor Performance Specifications

Download PDF