Project Overview

Replaced a Light Cycle Oil (LCO) Tank with a 50,000 Barrel swing tank capable of handling 3 products; LCO, gasoil, and asphalt. This was a full multidiscipline job including considerable stress analysis for multiple temperature products. The brown field aspects of this job included consideration for containment within the plant, fire control for multiple products, and simplified operator access to the multiple systems.

LCO Tank Replacement main LCO Tank Replacement first LCO Tank Replacement second

Multi-Discipline Engineering

The project required engineering efforts from process, mechanical, piping, electrical, instrumentation, civil, and structural disciplines, as well as stress engineering and project controls.

Project Phases

Rally managed all phases of work through to completion (project initiation, design basis memorandum (DBM), detailed engineering, and procurement / contracts). As part of project planning, a capital cost estimate and detail schedule were developed and used as the baseline for project controls.