The following equipment was replaced as part of the project:
- Manual isolation switch was replaced with a new motorized switch.
- PCB contaminated oil circuit breaker was replaced with a new SF6 circuit breaker.
- New 20/26MVA transformer replace the existing PCB contaminated transformer.
- New neutral grounding resistor.
- Existing relay panel was replaced with a new relay control panels.
The project modified the existing building to install a new arc flash rated 5kV motor starter to replace the existing equipment. The new 5kV motor starters fed the existing unit protection cabinets and service transformer. A new arc flash vent was installed and designed to exhaust at a safe location near the top of the building.