Project Overview

Reciprocating Compressor Station project included installation of two (2) 1340 HP reciprocating single-stage compressor units for a Client near Edmonton, Alberta.

As part of the project, Rally completed the initial development, detail engineering, commissioning, and construction support for the new compressor station, which included: installation of the associated piping yard valves; auxiliary equipment; and electrical, instrumentation and process equipment.

Reciprocating Compressor Station main Reciprocating Compressor Station first Reciprocating Compressor Station second

Scope of Work

Completed design and commissioning of new facility, including design provisions for two (2) future compressor units. Project included: process engineering; civil site development; plant layout; foundations; structural; piping; mechanical; HVAC; electrical; instrumentation; control system design/programming; procurement; expediting; construction field support; and as-building.

Project Cost Savings

Re-utilization of existing process control and auxiliary equipment / buildings evaluated and maximized to reduce overall project cost. Existing REMVue panel, for one unit, re-purposed, upgraded and integrated into the facility.