The rental equipment package was to be installed on a new gravel pad foundation. The package also included electrical equipment (power panels and transformers) fed via rental diesel generators. The project included cable trays and cabling for approximately five (5) mega volt amp (MVA) of electrical equipment.
Rally produced 13 construction work packages (CWPs) followed by 14 field change notices (FCNs) to support the construction of Tank Farm Temporary Chiller project. All the CWPs and FCNs were discipline-specific in order to simplify the scope for the field contractors. Rally provided construction coordination, field engineering / construction planning, and scheduling support.