Demolition of the existing mechanical and electrical HVAC system and installation of the new units, as well as installation of a new control panel and associated electrical, communications, and associated components. A new fire damper, new piping, and foundation and steel bases for the new HVAC units were completed as well.
The makeup air (MUA) units on top of the U2 coker at the Client’s site were at the end of their serviceable life and needed to be replaced. Rally completed detailed engineering for the installation of the new units. Rally provided engineering packages in line with industrial type project execution standards, as opposed to conventional HVAC commercial projects, to minimize the risk of rework and delays during the field execution. Emphasis was placed on field visits by all disciplines to ensure that detailed engineering was as correct and complete as possible.