Cable Trays For Compressor Station

Cable Trays For Compressor Station

1.5 MVA Transformer for ETF Temporary Chillers

1.5 MVA Transformer for Temporary Chillers

Cable Trays for ETF Temporary Chillers

Cable Trays for Temporary Chillers

25kV Switchgear For ETF Temporary Chillers

25kV Switchgear For Temporary Chillers

Five 1.5 MVA Transformers for ETF Temporary Chillers

Five 1.5 MVA Transformers for Temporary Chillers

Cable Trays 2 For Compressor Station

Cable Trays For Compressor Station

Cable Trays 2 for ETF Temporary Chillers

Cable Trays for Temporary Chillers

play_circle_filled
play_circle_filled

Electrical Engineering

  • Brown and greenfield projects (utility supply, sub-station and distribution; scoping studies, equipment utilization and final deliverables for construction).
  • Hazardous Area Classification Assessments, studies and drawing development.
  • Power System studies (power system modeling, load flow and short circuit analysis, grounding, motor starting, protective device coordination, arc flash hazard analysis).
  • Compliance with industry and regulatory codes and standards.
  • Construction Packages (single line diagrams, area classification layouts and details, cable schedules, power layouts, panel schedules, lighting layouts, schematic and wiring diagrams, grounding layouts, installation details, electric heat tracing layouts, isometrics).

Contact

Michael Wagner Electrical Department Head

780-570-8653 Michael.Wagner1@rallyeng.com